Monday, September 1, 2008

Forms

The forms were put in while
we were on vacation.
This is a view
from the SW corner
where the dining room
will be.
Inspections soon
and then the pour.

Up above at the driveway
we are starting
to get a feel
for the approach.

The Dig Out

The daylight basement

is being dug here.

Luckily, there have been no

big rocks or boulders

which add to the work/price.

Excavators have a "rock clause"

in their contracts.

The guy with the stick

is standing

in our future living room.

The upper shelf above is for

the 'driveway turnaround'

which will be a sports-court

for Reece.

Tuesday, August 5, 2008

Joe vs. Red Alder

Here's Joe

taking down a 50ft Alder.

Check out the textbook

wedge cut,

and 'run for your life' technique.

Excavation


Excavation!
This is the start of a temporary road
which will allow
well drilling rigs
to drive down the hill.
We will need to strike water
before the construction loan
can finalize.
The site looks very different
already.

Here's the drill rigs in position.
The well sub-contractor went down 242 feet

to find an aquifer that meets the required

flow rate.

10gpm (gallons per minute) is average

for city water - we will be at around

12gpm - all good!

40 foot tall - impressive.



Still amazed that there is water

flowing underground that we can tap into.

Found this image that illustrates the concept.

Glad we hired this "dowsing" professional

to help us strike water.









Monday, August 4, 2008

Timber

"Felled" about 25 trees
mostly Red Alder
from 4" to 14" diameter
Much thanks to Joey B. who helped
all day Saturday
and took some great high speed shots.
I watched
"how to cut a tree down safely"
the night before
on the web.
Which came in handy -
Only a few trees veered off course
and smashed the construction fence.
We decided to leave the larger trees
for the pros.

Friday, August 1, 2008

The Permit

The building permit came through!
After a 4+ month battle with the City
It's a go....Now we can build.


The House

Here's the front elevation
.
working on colors/finishes now
.
Entrance is on the upper floor
accessible from the street
with a footbridge
.