This is the start of a temporary road
which will allow
well drilling rigs
to drive down the hill.
We will need to strike water
before the construction loan
can finalize.
The site looks very different
already.
Here's the drill rigs in position.
The well sub-contractor went down 242 feet
to find an aquifer that meets the required
flow rate.
10gpm (gallons per minute) is average
for city water - we will be at around
12gpm - all good!
40 foot tall - impressive.
Still amazed that there is water
flowing underground that we can tap into.
Found this image that illustrates the concept.
Glad we hired this "dowsing" professional
to help us strike water.
No comments:
Post a Comment