Sunday, January 25, 2009
Saturday, January 17, 2009
2009- Recap
Finished items:

All in windows but one have been installed

Upstairs guest area which walks out to roof deck
- Furnace installation/HVAC components
- Window/Door installation (all but 2- one broken and one missing)
- Roof
- Plumbing for now (fixture installation later)
- Permits (too many to list and more to go)
- Electrical
- Siding
All in windows but one have been installed
Upstairs guest area which walks out to roof deck
Saturday, December 20, 2008
Thursday, December 11, 2008
Saturday, December 6, 2008
The Roof Deck
The railings were framed out this week.
The large openings will be filled
with stainless steel cable
and the smaller openings
with light boxes.
Railing at the entry
The roof deck
with guest apartment beyond
Reece likes to help with the sawdust
The exterior doors have arrived!
Labels:
framing,
railing details,
roof deck,
roof planters
Framing continues...
The entry is on the top floor.
We inset the door and adjacent walls here
to break up 'the box'
The hallway
separates the bedroom areas.
Being on the south
side of the house,
we will get lots of light here.
A view of the SW corner
The daylight/ventilation shaft
from the kitchen
20 feet below.
Framing a view