Saturday, February 7, 2009

Drying out the house with fans and circular window installation


We have two circular windows installed by the front door



Due to all the moisture in the wood from the snow and rain we have had fans blowing for over a week. This has to be done before drywalling can begin. We ordered the siding this week which will be delivered in the next 3 weeks.

Issues with Roof



The roof has speed bumps- of course, the roofer insists that wrinkles always occur after installation & will diminish over time. Besides appearance, we are concerned about the ponding of water and the indirect route that water takes to the drain.









Moving right along


Scott put cap on railing and on planters of roof deck


To save us some $ Scott is doing some interior framing. He's framed out some of the kitchen. This is the half wall dividing the kitchen from the living room

Gas fireplace was installed


Scott is framing kitchen cabinets/stove area




Reece wearing dad's ear guards


Saturday, January 17, 2009

Exterior Waterproofing/Window pics


Roof deck/light shaft window is installed


Windows/Flashing in Master Suite

2009- Recap

Finished items:
  • Furnace installation/HVAC components
  • Window/Door installation (all but 2- one broken and one missing)
  • Roof
  • Plumbing for now (fixture installation later)
  • Permits (too many to list and more to go)
In progress:
  • Electrical
Soon:
  • Siding

All in windows but one have been installed


Upstairs guest area which walks out to roof deck

Dining Room entrances